I got a little time today and addressed some of my remaining tasks. 1/4" ply finally went on the back of the vertical drawers to seal up that area. I used my laminate router (love that thing) to get it as flush as possible. It doesn't yet cover the bottom, as I was just using what I had.
I also decided to cannibalize one of the top deep drawers to get my safety switch up and functional again. I haven't felt as safe as I could have been with it missing. I'll eventually remove the drawer all together but this will work for now. When I trim out the cabinet I will dress it up.
The last bit was putting in the dust port in the back, I'll be able to hook up a tee and grab dust from top and bottom.


You can also see I've made great strides in recovering floor space. This was taken in the shop on a rainy day - absolutely everything is still inside and the table is rolled out from the corner.
- Posted using BlogPress from my iPhone
No comments:
Post a Comment